CSPP and SPCD Tool Kit
This page provides a consolidated list of all the tools (e.g., checklists, templates, information) provided in this WebResource. Most of the tools have been provided in Microsoft Word to allow the user to customize the tools based on an individual airport and project. Tools may be accessed by clicking on the links below:
Internal CSPP Review Checklist
CSPP Process Checkpoints Checklist
Construction Daily Inspection Checklist
Airport Internal CSPP Communications Checklist
CSPP External Stakeholders Checklist
Group vs. Individual Meeting Guidance
Contractor Training Guide (CTG)
As part of this research process, a Contractor Training Guide (CTG) was developed to aid airport staff and consulting engineers/designers in generating customized training programs for contractors. The CTG can be downloaded from the link below. Additionally, a video has been provided discussing the CTG and how to use it.
Contractor Training Guide (CTG)
FAA Checklists
The FAA has multiple internal checklists for closing and opening airfield pavements. Airport operators and consultants may find these useful in understanding the necessary processes to open or close a runway during an airfield construction project. The checklists can be accessed by clicking on the links below:
Runway Construction Closure Checklist
Runway Construction/Opening Checklist
Runway/Taxiway Opening Checklist
Taxiway Construction Checklist
Partial Runway Construction Closure Checklist
FAA Guidance Materials
Key FAA documents related to airfield construction and CSPP development, implementation, and management can be accessed by clicking on the links below:
FAA AC 150/5370-2 (Current Edition) – Operational Safety on Airports During Construction
Series 150 Advisory Circulars (ACs) for Airport Projects