FAA SOP 7.00: Standard Operating Procedure for Airport Improvement Program Construction Project Change Orders

Details

Abstract: The purpose of this standard operating procedure (SOP) is to establish uniform procedures for the FAA Office of Airports (ARP) that address reviewing and approving change orders for airport construction projects.

Publication Year: 2015

Authoring Organization: FAA

Airport Type: All Airports

Resource Type: PDF

Hyperlink: https://www.faa.gov/airports/resources/sops/

Page Count: 27

Cost: Free

Phase(s): Construction, Design

Functional Area(s): Airfield and Approach Lighting, Apron, Drainage or Stormwater, Navigational Aids (NAVAIDs), Pavement, Runway, Taxiway or Taxilane

Keyword(s): Airfield Construction, Airport Improvement Program (AIP) Grant Funding, Construction Specifications