FAA Order 6480.4B: Airport Traffic Control Tower Siting Process
Details
Abstract: This order establishes requirements for determining the site location, tower height, and cab orientation of a proposed new, replacement of the existing, and modernization of airport traffic control towers (ATCTs) where the overall structure height is changed. The order also establishes a siting process utilizing the standard Airport Facilities Terminal Integration Laboratory (AFTIL) method or the alternate siting process for qualified candidates. The order further defines a method for the reporting and approval of siting activities.
Publication Year: 2018
Authoring Organization: FAA
Airport Type: All Airports
Resource Type: PDF
Page Count: 70
Cost: Free
Phase(s): Construction, Design, Planning
Functional Area(s): Air Traffic Control
Keyword(s):