The tasks within the CSPP Management Phase can be separated into three categories:
Each category and the tasks within each category are discussed below.
The following tasks are part of the ongoing CSPP management tasks and play a central role in reinforcing a culture of safety and collaboration:
Throughout the life of a project, the airport, consulting engineer/designer, and contractor should continuously monitor the CSPP and SPCD to identify whether revisions to the documents may be necessary. If the need to change the CSPP or SPCD is identified, the tasks below should be followed:
The following tasks are part of the post-construction tasks:
Once the responses are “Yes” to each of the questions above, the lessons learned from the project should be properly documented to improve future performance. It is recommended that airports create and maintain a running list of lessons learned from past projects for integration in future projects.
The focus of each task and checkpoint in the CSPP Implementation Phase is provided below:
Once the responses are “Yes” to each of the questions above, the team (e.g., airport, consulting engineer/designer, contractor) is ready to proceed to CSPP Management Phase.
The focus of each task and checkpoint in the Initial CSPP Development Phase is provided below:
Once the responses are “Yes” to each of the questions above, the team (e.g., airport and consulting engineer/designer) is ready to proceed to Task 2.7 – Development of Final CSPP.
The focus of each task and checkpoint in the Pre-CSPP Activities Phase is provided below:
Once the responses are “Yes” to each of the questions above, the airport is ready to proceed to the Initial CSPP Development Phase.